Temperature shock test chamber refrigeration unit sewage and leak detection steps

The operation steps of the sewage impact test chamber refrigeration unit for sewage discharge and leak detection are as follows:

1. Connect the pressure reducing valve to the nitrogen bottle, and connect the nitrogen bottle pressure reducing valve with the system ammonia valve with a nitrogen tube;

2. Open all valves in the system except the valves that connect to the atmosphere;

3. Open the ammonia-adding valve and the nitrogen valve, and fill the system with nitrogen to the low-pressure part of the test pressure;

4. Close the ammonia-adding valve and the nitrogen valve, and use a brush to stain the soap, water or detergent to all the joints, pipe joints, flanges, valves, etc., and seal the joints for leak detection;

5, find the leak point, mark the mark, find a batch of leak points, the temperature shock test chamber laboratory operator is located in the safe position of the sewage operation to unscrew the lower part of the low-pressure circulating liquid reservoir (or gas-liquid separator) , discharge and release nitrogen;

6. To make up the leak, screw on the screw plug of the low-pressure circulating liquid reservoir (or gas-liquid separator), refill with nitrogen, and the operator is in the safe position of the blowdown operation to unscrew the screw plug in the lower part of the intercooler, draining and releasing nitrogen;

7. Repeat the previous two steps until there are no leaks;

8. Close the low pressure circulating liquid reservoir (or gas-liquid separator) inlet valve and drain valve, close the drain bucket outlet valve and drain valve, compressor suction valve and drain valve, and fill the system with nitrogen to High pressure part test pressure;

9. In the high-pressure part of the temperature shock test chamber, check the leak, find the leak point, mark the mark, find out a batch of leak points, the operator is in the safe position of the blowdown operation, unscrew the screw plug at the lower part of the drain bucket, discharge and discharge Nitrogen

10. Make up the leak, screw on the screw plug of the drain barrel, refill with nitrogen, and the operator of the temperature impact test box is located at the safe position of the blowdown operation to unscrew the screw plug at the lower part of the high pressure reservoir, draining and releasing nitrogen;

11. Repeat the previous two steps until there are no leaks.

Temperature shock test chamber refrigeration unit sewage and leak detection steps

Kid's Furniture

The height of the awesome kid furniture can change with the height of the child to achieve synchronous growth and avoid bad daily writing habits caused by the child's height difference. The adjustment of modern kid furniture is also very easy and portable. You can adjust the height of the table by turning the screws on the sides of the table.
Children are naturally active, so the safety design of kid proof furniture is essential. The overall structure of the table is designed to be sturdy and durable, and there are protective devices on the edges to ensure the safety of children. This is a furniture suitable for children.

best kid furniture

Kids' Furniture Sets,Kid Friendly Furniture,Kid Furniture Kit,Modern Kid Furniture

Igrow Technology Co.,LTD , https://www.szigrowdesks.com